After the shaking
Moving after the shaking
Provincial plans direct people to shelter where they are after a major earthquake. Damaged routes are needed for emergency traffic and supplies.
Last reviewed
Provincial plans tell people to stay where they are
From the planning assumptions in the province’s Earthquake Immediate Response Strategy:
“Spontaneous mass evacuation out of the impact area will not take place: … public messaging will emphasize sheltering within the region … Critical casualties, essential response personnel, those in imminent danger, and stranded travellers will be re-located as part of the immediate response.”
From the province’s risk and resilience assessment, on its Cascadia scenario:
“Damage to transportation routes and the prioritization of essential personnel and supplies make mass evacuation impossible, and the public is directed to shelter in place.”
Two provincial documents, written for two different scenarios, give the same instruction. The plan assumes people will not drive out, and that the roads will be doing other work.
Large parts of the area “will be inaccessible by road due to earthquake-induced landslides, liquefaction, and other secondary impacts such as bridge collapses”. And “Road, rail, air, and marine transportation will be disrupted, and existing supply chains will be inoperable.” Liquefaction there means saturated soil losing its strength and behaving like a liquid while the ground shakes.
Water and mountains limit the routes out
Every road, rail and transit crossing off the Vancouver peninsula and onto Richmond, 19 in all. Vancouver's land connection runs east; everything else is a bridge or a tunnel.
Bridge Tunnel
Burrard Inlet
- Lions Gate
- Ironworkers Memorial Second Narrows
False Creek
- Burrard
- Granville
- Cambie(seismic upgrade under way)
North Arm of the Fraser
- Arthur Laing
- Oak Street
- North Arm (Canada Line)
- Knight Street
- Queensborough
Middle Arm of the Fraser
- No. 2 Road
- Dinsmore
Fraser River
- Westham Island
- George Massey Tunnel(replacement due in 2031)
- Alex Fraser
- stal̕əw̓asəm(replaced the Pattullo in 2026)
- Port Mann
- Golden Ears
Pitt River
- Pitt River
What happens to those crossings in a major earthquake, and to the ground their approaches sit on, is the subject of transportation.
Disaster Response Routes are for emergency traffic
The signs stand on roads across the region. A network of provincial and municipal roads was designated in 1995 across Metro Vancouver and Greater Victoria to move emergency responders and supplies. The routes are open to everyone until a state of emergency is declared, and then they are activated and controlled. Authorised users must carry both government-issued photo identification and employment identification.
The official instruction to the public is to get off the route as soon as possible, to make way for emergency responders.
The province does not oversell them: “Like any infrastructure, these routes are susceptible to hazards and could potentially be negatively impacted by the emergency event.”
The doctrine changed in June 2018: “DRRs are not designated pre-event. DRRs are determined at the time of the event based on the needs of response and recovery and available options.” What is designated in advance is now called a critical route. The advice to the public is unchanged.
Among the published considerations for choosing roads for response routes: “Consider avoiding steep grades, circuitous routing, bridges, tunnels, overpasses and underpasses.” Seismic retrofit status is one of the vulnerability criteria in the same guide, alongside soil stability and how close the road runs to gas and water lines.
Local roads are cleared last
Metro Vancouver’s regional debris management plan sets the clearing priority:
“Lifelines: Routes essential to life safety transportation, e.g. evacuation routes. Critical Infrastructure, e.g. hospitals, ambulance halls, police stations, EOCs, telecommunication sites, water sanitation sites, power generation and transmission sites. Clear major freeways and arterial routes. Clear areas necessary for movement of goods and services and/or economic restoration. Clear minor arterial routes. Clear local routes.”
Local roads are last. The plan’s suggested starting point is one this region already knows from winter: “Local Authorities may choose to use their snow removal routes as a base”.
Provincially, the same sequencing applies to reopening. Critical routes “are used as a reference to prioritize the restoration of routes for regional mobility for all traffic”, and “Emergency responders should only use damaged routes after safety assessments have deemed the damaged routes safe for emergency use.”
Three BC highways took months to reopen after the 2021 floods
The only measured evidence of how long it takes to reopen a severed highway in this province comes from the atmospheric river of November 2021. Every figure below is rainfall damage from that storm. None of it was caused by an earthquake.
- Highway 5, the Coquihalla. Closed on 14 November 2021 by that rainfall, with more than 20 damaged sites along 130 km, including seven bridges where spans collapsed or were heavily damaged. Reopened to commercial traffic in 35 days and to all traffic after about 66 days. The last permanent bridge was finished in October 2023, about 23 months after the storm.
- Highway 1, the Fraser Canyon. Closed on 14 November 2021 by the same rainfall, with 18 damaged sites between Hope and Spences Bridge, and reopened after 61 and 71 days on two segments. Permanent repairs on that rainfall damage ran into 2025, with one culvert expected in 2026.
- Highway 8, the Nicola Valley. Also closed by the November 2021 rainfall, with 25 damaged sites and more than 13 km of road to rebuild. Reopened to the public on 9 November 2022, about 12 months after the storm, and restored to two lanes only in December 2025.
The provincial flood strategy puts the economic impact of the November 2021 rainfall at $5 to $7 billion and records that it cut “main access routes to B.C. and Canada”. Peer-reviewed work on the same rainfall event describes its ground failures as “severing land connectivity between Metro Vancouver and the rest of Canada”, and one of its authors works for the road authority.
Those are the durations this road authority and these contractors achieved in this terrain.
A damaging landslide wave in Howe Sound is unlikely
Federal mapping “concluded that none of the landslides that entered Howe Sound were large enough to produce a significant tsunami”, and a landslide into the sound large enough to produce damaging waves on Bowen Island is assessed as unlikely. An earlier North Shore assessment agrees, putting the probability as “very low, although not zero” and finding the North and West Vancouver waterfronts not at risk from such a wave.
No estimate exists for how many people would leave
The route out of the region would be a damaged road, cleared in an order that puts local streets last. How much of the network the province expects to be working, and for how long, is set out in transportation.
What you can do
The decision that matters is where you will be when it happens.
- Decide where you would rather be stuck, and be there. Know which side of the water you will be on during a working day, and plan to stay on that side. The province’s plans assume exactly that: shelter within the region, where you already are.
- Keep a small kit wherever you may have to stay. A workplace where you might spend several days needs supplies of its own.
- Plan a way home that does not need a vehicle or a train. The City of Vancouver’s own advice is to plan alternate ways home, because “roads may be blocked and trains will not be running until damage assessments are complete”.
- Agree with your household who you will each contact, and where you will each go. A single agreed person and a single agreed place removes the reason to set out across a damaged city.
- If you are on a Disaster Response Route when one is activated, get off it. That is the province’s instruction.
Sources on this page
Numbered in the order they are cited. Each entry links back to where it is used.
- [1]ReportProvincial Earthquake Immediate Response StrategyMinistry of Emergency Management and Climate Readiness, Province of BC · 2022Rev. 1.1, 135 pp: the crustal M7.0 Greater Vancouver planning scenario, its impacts, the planning assumptions, the formal mutual-aid instruments, and the two-weeks-versus-72-hours pair on p. 42Open the document ↗
- [2]ReportDisaster and Climate Risk and Resilience Assessment: Provincial ReportEMCR and Ministry of Energy and Climate Solutions, Province of BC · 2025Incl. ch. 5 §5.6 Extreme Events (the M9.0 Cascadia scenario)Open the document ↗
- [3]ReportDisaster Response Routes backgrounder and mapCity of Pitt Meadows / BC MoTI · 2018Confirms the 1995 designation and the short/medium/long-term structure; "like any infrastructure, these routes are susceptible to hazards"Open the document ↗
- [4]ReportDisaster Response Routes, public pageProvince of BCActivation, photo and employment ID, and the instruction to exit the route. The site refuses a request that does not come from a browser, so the link has to be opened by handOpen the document ↗
- [5]ReportBritish Columbia Disaster Response Transportation PrimerBC MoTI and Emergency Management BC, with IPREM, NSEM and the City of Vancouver · 2018Replaces the 1995 DRR concept with critical routes; recovery prioritisationOpen the document ↗
- [6]ReportBC Disaster Response Transportation Planning Guide for Road TransportationBC MoTI and Emergency Management BC · 2018Seismic retrofit status as a route-selection criterionOpen the document ↗
- [7]ReportJoint Municipal Regional Disaster Debris Management Operational PlanMetro Vancouver REAC / IPREM / CCEM · 2017V2.0: §2.5 clearing-priority order; activation thresholdsOpen the document ↗
- [8]ReportResources pageIntegrated Partnership for Regional Emergency Management (IPREM)"Due to the sensitive nature of some of our work, some materials are only available upon request"Open the document ↗
- [9]ReportBC Highway Flood RecoveryProvince of BC · 2026Highway 5 Coquihalla. Rainfall-triggered, November 2021, not an earthquakeOpen the document ↗
- [10]ReportBC Highway Flood RecoveryProvince of BC · 2026Highway 1 Fraser Canyon. Rainfall-triggered, November 2021, not an earthquakeOpen the document ↗
- [11]ReportBC Highway Flood RecoveryProvince of BC · 2026Highway 8. Rainfall-triggered, November 2021, not an earthquakeOpen the document ↗
- [12]ReportFrom Flood Risk to Resilience: a B.C. Flood Strategy to 2035Province of BC · 2024Open the document ↗
- [13]ReportSepúlveda, S.A., Ward, B.C., Cosman, S.B. & Jacobs, R., Canadian Geotechnical Journal 60(4):580–586; DOI 10.1139/cgj-2022-0093Canadian Science Publishing · 2023Ground failures "severing land connectivity between Metro Vancouver and the rest of Canada". November 2021 rainfall event, not an earthquake. The site refuses a request that does not come from a browser, so the link has to be opened by handOpen the document ↗
- [14]ReportTsunami Hazard and Risk AssessmentBowen Island Municipality · 2019Dr John J. Clague, SFU Earth SciencesOpen the document ↗
- [15]ReportClague & Orwin, Tsunami Hazard to North and West Vancouver, British Columbia, SFU Centre for Natural Hazard ResearchNorth Shore Emergency Planning Office · 2005Open the document ↗
- [16]ReportHazard & Risk Explorer, Earthquake and Introduction chaptersCity of Vancouver (ArcGIS StoryMaps) · 2025"a minimum of 3 days… although your target should be a week to 2 weeks", 4 litres per person per day, the renter and "if you are able" hazard lists, water-heater strapping, the gas shut-off instruction, the Christchurch cordoning analogue, the equity statements, and the DFPS without its coverage area. An ArcGIS StoryMaps collection: the page assembles itself in the browser, so it has no fixed text to quote or to archive. The date is the item's own timestamp for its last change, not a date of publicationOpen the document ↗